The highway project commenced on May 19th 2008, which begins at the Belt Road 3 in the capital city, traverses Hung Yen and Hai Duong provinces, and ends at Dinh Vu port of Hai Phong city with a length of 105.8km and a width of 33m with six lanes. It has an intended speed of 120km per hour.
As Christmas approaches, Hanoi, Ho Chi Minh City and many other cities are filling with colors, products serving Christmas season that makes all areas overwhelmed in the Christmas atmosphere.
Noi Bai airport has opened T2 terminal. At the beginning, it will be used for all arrival/departure inteternational flights. During first time operating of new terminal, there are some problems for the arrival international flights.
Le 2e Vietnam Victory Challenge a eu lieu du 11 au 13 mars dans la ville de Da Lat et le district de Lac Duong, province de Lam Dong (Hauts Plateaux du Centre), avec la participation de 165 cyclistes vietnamiens et étrangers.
Soyez le premier à connaître nos offres de voyage exclusives et les nouveaux circuits !.